







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Jerith Home Additions & ADU: The San Jose Owner’s Guide
A Jerith home addition or ADU project in San Jose typically runs $53,100 to $153,400 installed, depending on square footage, site prep, and whether you’re adding a ground-floor bump-out or a full detached accessory dwelling unit. We carry and install Jerith-compatible structural components and finishes, and the usual discovery point is a failed weather barrier, a sagging corner, or a substrate that’s started to rot under an aging door or window frame. You’ll know something’s wrong when the floor feels soft near the exterior wall, or when you spot daylight coming through a seam that used to be tight.
Bradford Remodeling Co San Jose is an independent contractor, not affiliated with Jerith. What we do is match their components to your specific build, price the work in writing before anything starts, and stand behind it for a full year.
Which Jerith Models This Applies To

Jerith’s residential lineup includes aluminum and steel fence and gate systems that often get integrated into San Jose ADU projects as perimeter enclosures, plus gate hardware and framing components. The compatibility gotcha most owners run into is the gate post: Jerith posts come in both 2-inch and 2.5-inch square profiles, and the hinge specs don’t crossover. If you measure the post face before ordering, you’ll save yourself a return trip and a restocking fee. The model label sits on the inside face of the gate frame, near the top rail, and will list a series code like “Regal” or “Imperial” along with the gate width.
For OEM versus aftermarket, the honest answer is that Jerith’s own hardware is engineered to their gate weight and wind-load assumptions, which matter in San Jose’s exposed foothill neighborhoods where gusts come through the canyons. A generic big-box hinge might hold for a season, then sag. We spec OEM for anything load-bearing (hinges, latches, post caps) and use aftermarket only for cosmetic trim where the spec matches.
Styles & brands we work with







Signs Your Jerith Home Additions & ADU Is Failing
- Soft spots near the exterior wall. This usually means water has gotten past the weather barrier and the subfloor or bottom plate is breaking down. In San Jose’s wet winters, a failed flashing detail turns into rot faster than most people expect.
- Doors that stick or won’t latch. If a door that used to close clean now binds at the top corner, the rough opening has shifted. That points to either settlement or a compromised header, both of which need a look before they get worse.
- Visible daylight through corner seams. Gaps at the corner trim or where the addition ties into the original house mean the joint has opened. That’s an entry point for water, rodents, and your heating bill.
- Condensation or staining on interior drywall. Recurring dampness on a wall that shares the addition’s exterior face signals a breached vapor barrier or failed caulking. The fix is usually straightforward if caught before the drywall has to come down.
- Sagging gate or fence line against the new structure. San Jose’s clay soil expands and contracts with seasonal moisture, and it will move a post set too shallow. If your Jerith gate drags the ground six months after install, the footer wasn’t deep enough for our soil conditions.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For San Jose, a full home addition runs $53,100 to $153,400 installed. A detached ADU runs higher: $106,200 to $259,600. Where you land in that range depends on square footage, foundation type, whether the existing structure needs reframing, and the finish level inside. A partial repair, like replacing a failed weather barrier or rebuilding one corner, falls at the low end of the addition range.
Every number we give includes labor, materials, permit coordination, and haul-away. You get a written line-item price before any work starts, and that price doesn’t move unless you change the scope. All completed work carries the 365-Day Done Right Promise: if the addition or ADU fails inside that year, we come back and make it right at no charge.
DIY or Call Us?
You can safely check the obvious things: run your hand along the interior drywall for damp spots, look at the caulk lines around windows and doors, and eyeball the gate posts for lean. What you shouldn’t do is start pulling off siding or opening a wall. Once you break the weather barrier, you’re on the clock for re-sealing it correctly, and a botched tie-in between new and existing framing is how small problems become five-figure ones.
If you’re seeing any of the signs above, call us at (669) 272-2637. We’ll send a background-checked, uniformed technician to assess it, give you a written price, and tell you straight whether it’s a repair or a replacement. No charge for the estimate.
FAQs

A properly built addition in San Jose should hold for 50 years or more, but the exterior finishes and weather barriers need inspection every 5 to 7 years. Our climate’s wet-dry seasonal cycle works on caulking and flashing harder than a steady climate would. Call (669) 272-2637 for an exact assessment, estimates are free.
Yes, in many cases a failed section can be repaired, especially if the framing is sound and only the weather barrier, sheathing, or trim has failed. The deciding factor is whether water has reached the structural members. If it has, replacement is the only move that doesn’t buy you a repeat failure. Call (669) 272-2637 and we’ll tell you which one you’re looking at.
A focused repair, like replacing a failed corner or re-flashing a window, typically takes 2 to 5 days on site. A full addition or ADU build runs 8 to 16 weeks depending on scope and San Jose’s permit timeline. We’ll give you a schedule in writing with the price. Call (669) 272-2637 to set up a free estimate.
We keep common Jerith-compatible gate hardware and flashing materials on the truck for immediate work, and we document every spec we can’t verify on-site. That means no guesswork on the order. Call (669) 272-2637 and a real person picks up, 24/7.
Straight number, written scope, done when we said done. If you’re in San Jose and your Jerith addition or ADU is showing signs of trouble, call (669) 272-2637 to schedule your free estimate. We’ll put the price in writing before anything gets torn apart, and you’ll have a signed guarantee in your hand when we’re finished.
Written by Curtis Lane, Owner, Bradford Remodeling Co at Bradford Remodeling Co San Jose, serving San Jose and nearby areas.


